FP McCann’s Omagh Depot Supplies Concrete to Omagh Waste Water Treatment Works
Site: Omagh Waste Water Treatment Works
Main Contractor: Dawson Wam
Products Supplied: Ready Mix Concrete, Drainage Aggregates and Kerbs
Date of Completion: Ongoing
FP McCann have successfully supplied Dawson Wam with RMC from our Omagh depot for a new sludge tank at Omagh WWTW.
The project is still ongoing with approximately 460m3 of Ready-Mix Concrete delivered so far. A variation of mixes including a lower carbon GGBS concrete mix have been supplied. As well as being environmentally friendly, this mix is also beneficial in more aggressive chemical environments and has a slower heat rate hydration.
Due to its location and batching capacity, the Omagh Depot was the ideal plant to supply this project. Other products supplied to the project include drainage aggregates and kerbs.
Ben Mullen from the main contractors on site, Dawson Wam has stated: “We’re very impressed with the products supplied by FP McCann at the Omagh Waste Water Treatment Works. FP Mc Cann were easy to work with and everything was supplied on time and to a good standard. We appreciate their efforts throughout this ongoing project”.
For further information on FP McCann’s ready mix concrete, contact the sales team at any of our depots:
- Armagh – 028 3755 1126
- Kilrea – 028 2954 0285
- Lisnaskea – 028 6772 1286
- Larne – 028 2826 0824
- Knockloughrim – 028 7964 2558
- Mallusk – 028 9083 0005
- Omagh – 028 8077 1667