Focus On: Albert Street, Belfast

Title: Albert Street & Cullingtree Road Public Realm Environmental Improvement Scheme

Principal Contractor: FP McCann Ltd.

FP McCann Project Manager: Conor McConville

Designers & Project Management: McAdam Design

Client: Department for Communities

DfC Logo

On behalf of the Department for Communities (DfC), FP McCann recently completed Public Realm Environmental Improvements along Albert Street and Cullingtree Road. The scheme extended from the junction of Albert Street and Divis St to the end of Albert St at the Westlink Backpath, and along the full length of Cullingtree Road, and in­corporating St Peters Close. The scheme was one element of a 3 scheme incentive for the Lower Falls area of Belfast.

The primary focus of the scheme was to enhance the public realm along Albert Street and Cullingtree Road, by introducing a high quality, cohesive appearance to the streetscape. It aimed to create a welcoming sense of arrival to the Albert Street area, by introducing a distinctive style and character to the area, using high quality materials and a con­sistent approach.

Works commenced August 2021 and working on two consistent work fronts, completed May 2022. The extent of the works included:

Resurfacing of existing footpaths with asphalt, natural stone banding and granite aggregate kerbs; new tree planting, street lighting columns, railings and walls; improvements to the junction of Albert St and Servia St. Improvements to pedestrian crossings, on-street parking and speed control ramps.

Throughout the works and upon completion, the scheme received posi­tive feedback from local residents and community representatives alike.

Following a recent visit to the area Communities Minister Deidre Hargey commented: “I am delighted to see the positive impact this project has had on the quality of daily life for local people and for those who travel in and out of Belfast along this busy route.”

FP McCann supplied a large majority of the materials to the scheme:

  • 58nr Precast 450mm trapped gully pots
  • 300m Precast Kerbing
  • 1600T Imported aggregates, supplied by Loughside Quarry Depot
  • 550m³ Ready Mix Concrete, supplied by Mallusk and Loughside Depots
  • 2200T Blacktop materials, supplied by Mallusk Depot
FP McCann Albert Street - Deirdre Hargey Public Realm Scheme

Communities Minister Deirdre Hargey is pictured with Project Manager Eddie Abraham from McAdam Design Ltd and Conor McConville Project Manager for FP McCann Ltd

FP McCann Albert Street Public Realm Scheme

Albert Street

FP McCann Albert Street Public Realm Scheme

Albert Street

FP McCann Albert Street Public Realm Cathedral Nursery School

Cathedral Nursery School

FP McCann Albert Street Public Realm - Paving Outside St Peter's Cathedral

St. Peter’s Cathedral

FP McCann Albert Street Public Realm Scheme - St Peter's Close

St. Peter’s Close

FP McCann Albert Street Public Realm Scheme - St Peter's Close

St. Peter’s Close

FP McCann Albert Street Public Realm Scheme

Cullingtree Road Completed Aerial View