FP McCann Supply Ready Mix Concrete for a New Shed Floor In Armagh

Status: Ongoing

Site: DOE Salt Barn Armagh

Project Contractor: Totalis Solutions

Products Supplied: Ready Mix Concrete (RMC)

FP McCann Coote’s Quarry supplied Ready Mix Concrete for a new concrete shed floor in Armagh. This project is a new concrete floor used for storing salt.

FP McCann are supplying a very specific mix design of 40N watertight concrete for this project, which will be delivered in multiple loads to suit the timescale of the ongoing work. A delivery of 300m3 Ready Mix Concrete has been delivered to site at this point. 

Andrew Lytle, from Totalis Solutions has said: “FP McCann are supplying a large volume of a specific design mix of concrete to suit the needs of this project. We have received a large delivery of concrete in a timely manner with great communication levels from the team at FP McCann.”

The completion date for this project is September 2023.