Project Description

Client: Translink

translink-logo-768x173

Design and construction work to fully renew the Permanent Way of the Coleraine to Derry/Londonderry railway line between Coleraine & Castlerock and between Eglinton & Derry/Londonderry.

Works included:

  • Renewal of the track and associated infrastructure
  • Refurbishment of the Bann Bridge
  • Replacement of the Pottagh Bridge
  • New buried cable duct route
  • New signalling cables
  • Replacement and upgrade of culverts
  • Construction of a new access lane at Donnybrewer
  • Upgrade of the user and level crossing
  • Construction of ballast retention barriers
  • Track drainage works
  • Cess walkways