Project Description

Client: Belfast Harbour Commissioners

Installation of power cable ducting from Sydenham Road to the new Bombardier C-Series factory on Airport Road. Airport Road was also upgraded

Works included:

  • Trenching and ducting of over 1.5km for power cables
  • Supports attached to Airport Road bridge for power cables
  • Replacement of street lighting along Airport Road
  • Resurfacing and lining of carriageway along Airport Road
  • Resurfacing of footways along Airport Road
  • Replacement of kerbs
  • A new surface water drainage system