Bann Bridge Construction
Client: Translink
Works included:
- Temporary propping and turf coat encapsulated scaffolding system with fully boarded platform & walkways along either side to facilitate works
- Replacement of strengthening plates & rivets
- Repairs to longitudinal beam flanges
- Concrete replacement & spalled concrete repairs
- Preparation, cleaning down & painting steelwork
- Overhaul of the bridge lifting equipment
- Upgrade of the bridge lifting signal equipment hut