Bann Bridge Construction

translink-logo

Client: Translink

Works included:

  • Temporary  propping and turf coat encapsulated scaffolding system with fully boarded platform & walkways along either side to facilitate works
  • Replacement of strengthening plates & rivets
  • Repairs to longitudinal beam flanges
  • Concrete replacement & spalled concrete repairs
  • Preparation, cleaning down & painting steelwork
  • Overhaul of the bridge lifting equipment
  • Upgrade of the bridge lifting signal equipment hut