FP McCann’s precast concrete Drawpit Chambers installed on Manchester Airport Project
Status: Completed
Location: Manchester
Division: Power & Infrastructure
Main Contractor: Laing O’Rourke
Market Sector: Commercial

FP McCann has manufactured and installed 9 precast concrete power and communication cable drawpit chambers for the Manchester Airport Transformation Programme. Main contractor, Laing O’Rourke, is responsible for the design and construction of an extension to Terminal 2, which will more than double its current size once completed in 2020.
In addition, steps have been cast into each section and a sump formed in the chamber base units, whilst a waterproof bitumen coating has been applied to all external faces.
Commenting on the chamber installation, Section Engineer for Laing O’Rourke, Giedre Jurkonyte, said: “As we were on a very tight schedule, we chose the offsite built precast option to speed up installation. Precast elements are a more environmentally sustainable option, as less concrete is used and, as a result, FP McCann was able to reduce the wall thickness from 400mm to 300mm. There was no concrete wastage and vehicle footprint was minimised.”
The Manchester Airport Transformation Programme includes the Terminal 2 extension, a 3,800-bay multi-storey car park, the addition of three new piers and extension to the existing forecourt.



