FP McCann Retaining L Walls and Horizontal Prestressed Panels Installed on Glouchestershire Primary School Project

For South Gloucestershire Council

24th September 2019
Building work on a brand new primary school in Frampton Cotterell near Bristol is well underway. Once complete later this year, the Watermore school will comprise of 12 classrooms, a school hall and a kitchen along with multi-use open space and new car parking.
  • Status In Progress
  • Location Frampton Cotterell ,Gloucestershire
  • Division Walling
  • Main Contractor Midas Group
  • Market Sector Education

Prior to construction and as part of the bulk earthworks, foundation and landscaping of the scheme, FP McCann’s retaining precast concrete L Walls and horizontal prestressed panels have been installed to the perimeter boundary of the site as part of a king post system. This system accommodates the changes in land elevation.

Midas Group, one of the UK’s leading independent construction and property service companies secured the South Gloucestershire Council contract and has employed the services of Chepstow based groundworks and civil engineer Certus Construction to undertake ground infrastructure and drainage works.

The 50 linear metres of retaining L Wall has been supplied in heights ranging from 1 metre to 2.5 metres and fixed on a concrete base foundation. Where heavy tree rooting prevented the laying of a solid foundation, galvanised steel king posts were driven into the ground to receive the horizontal prestressed concrete panels.

There was 111 square metres of 160mm thick concrete panel walling installed to heights of approximately 3.0 metres. As each section of L wall and king post wall was completed, soil was backed up to achieve the required site levels.

Both the prestressed precast concrete wall panels and L Walls have been supplied from FP McCann’s Lydney factory in Gloucestershire. With a strict delivery window between 9.00am and 3.00pm loads were scheduled to minimise disruption around the existing school day.

Commenting on the L Wall and King Post Wall systems, David Peacey Director at Certus Construction says, “The reinforced concrete L Wall units are simple to install and provide an effective robust soil retention barrier. Prestressed concrete horizontal walling panels from FP McCann are the obvious choice to complement such a king post system. Speed of construction, strength and durability of the finished walls is key to the overall build programme.”