Burnside 3G Pitch and Changing Pavilion
Client: Burnside Ulster Scots Society
The contract was for the provision of a 3G pitch with associated changing pavilion building.
Works included:
- 3G pitch with perimeter ball stop fencing and floodlighting
- Changing facilities building containing 2 changing rooms with showers, toilets and a plant room. Also, a sewage treatment plant was installed
- Parking facilities
- Alterations to an existing retaining wall