Office Basement, Hoddesdon

  • FP McCann About Us Projects commercial Office Basement Hoddesdon

 

Project Details:
Client:       Fitzpatrick Contractors Ltd
Date:         June 2007
Product:   Prestressed Vertical Cantilever Walling

FP McCann was involved in the early stages of the project and was able to meet the complexity of the design and benefit the overall program of works. Site conditions were demanding due to numerous trades operating simultaneously however the steel frame and perimeter wall erection teams worked very closely together to ensure the rigid program could be achieved.

FP McCann achieved a time saving of approximately two weeks to the original program making sure that the client was very satisfied.