NI:028 7964 2558
GB:01530 240000

 

Civic Amenity Site - Oadby

  • FP McCann About Us Projects Environmental Civic Amenity Site - Oadby

 

Work Type:

 

Retaining Walls

Delivery Period:8 Weeks
Number of Units:526
Customer:Weldon Plant Ltd
Location:Oadby

Project Brief

FP McCann were awarded this project for their “quick easy precast solution” which enabled the contractor to start on site services in sequence with our delivery and were praised by their Mike Dex, by stating “FP McCann phased delivery arrangements were very good” Due to this diverse product we provide, FP McCann retaining walls offer the ideal, flexible solution for the design and formation of recycling and municipal tipping bays and compounds. Key benefits to highlight would be the fast and easy erection, flexible layout opportunities and improved strength and stability. Other advantages of using this solution would be that it offers a cost effective solution and is not weather dependant.

FP McCann's Solution

FP McCann's Retaining Walls Solution which are designed in accordance with Eurocode: Basis of structural design (BS EN 1990:2002) and Eurocode 2: Design of concrete structures (BS EN 1992-1-1:2004) can be customised and manufactured within the range of standard sizes to suit specific applications. Described to be total versatile and highly stable, under cover or outdoors, FP McCann's Retaining Walls Solutions are design to serve a variety of functions, Primarily, they are used to store and separate materials, wet or dry and can be formed into compounds, bays for silage and aggregates or simply configured as a long run of dividing walls.

Parent Category: Sectors