NI:028 7964 2558
GB:01530 240000

 

Research & Development

  •  FP-McCann-Precast-Concrete-Solutions-Research-And-Development

 

At FP McCann, we believe that continuous research and development of new products is the key to success in any industry. Our main emphasis consists of researching and developing new products that will exceed the limits of today's prevailing standards. Throughout our twelve manufacturing plants in the United Kingdom, we are using the most up-to-date technologies to produce new and innovative products. In addition to our precast product line, we are also always trying to develop our range of quality services including Civil Engineering, Ready Mix Concrete solutions, Surfacing and Housing Development.

Being at the forefront of the precast industry in the United Kingdom, we feel that our role is to constantly develop innovative solutions that solve engineering and architectural problems, reduce labor, material costs, and help to sustain the environmentWith our proactive approach on educating stakeholders associated with pipe jacking, tunnels, flooring and building to name a few, we are helping to grow the precast concrete market and make precast concrete the solution for the future.

Latest Product Development

Our precast Storm & Waste Water Management System 'StormStore' has been developed to suit a wide range of construction projects and drainage schemes. Recent studies have shown how the UK is being increasingly affected by Global warming with Atlantic Storms causing widespread flooding. The main reason why floods are happening across the globe is due to drainage systems not being able to cope with the increasing amount of rainfall resulting in water being discharged at large rates. The FP McCann WRc approved 100 year design life Storm Water Attenuation System has been designed to combat this and can be customised to suit all requirements. The Storm Attentuation System can be used for several solutions including Detention, retention, infiltration, Harvesting and Treatment of water.

StormStore Case Study

FP McCann recently completed a contract to supply and fit one of our StormStore water tanks at a brand new state-of-the-art Energy and Waste Centre in Leeds. The project was commissioned by Leeds City Council and PFI residential waste treatment and energy recovery partner, Veolia. The plant holds the ability to handle up to 214,000 tonnes of black bin waste per annum and generate approximately 11 MW of electricity for supply to the National Grid - enough for 20,000 homes. 

The £200 million turnkey Design and Build contract is the responsibility of building and civil engineering contractor Clugston. An integral part of the plant’s design is the installation of a 1200m3 underground water storage tank for emergency firefighting purposes. Consideration was given to all tank options, including in-situ build and plastic, but critical to the client’s requirements was water tightness, speed of construction and long life performance.

As part of the approval process, FP McCann’s WRc approved 100 year design life modular precast system met all criteria, with water tightness tests on the tank carried out using equipment from telemetry specialists Metasphere at FP McCann’s Littleport site in Cambridgeshire. 

  • FP-McCann-Precast-Drainage-Leeds-Storm-Store
  • FP-McCann-Precast-Concrete-Solutions-Drainage-Water-Management-Leeds-Storm-Store
  • FP-McCann-Precast-Concrete-Solutions-Drainage-Water-Management-Leeds-Storm-Store
  • FP-McCann-Precast-Concrete-Solutions-Drainage-Water-Management-Leeds-Storm-Store
  • FP-McCann-Precast-Concrete-Solutions-Drainage-Water-Management-Leeds-Storm-Store
  • FP-McCann-Precast-Concrete-Solutions-Drainage-Water-Management-Leeds-Storm-Store
  1. 1
  2. 2
  •  
  •  

 

"The StormStore modular precast concrete system from FP McCann fitted all aspects of the fire tank project brief. To install such a large tank in any other material or by any other method other than using off-site manufactured precast concrete would be both costly and impractical. Precast concrete is a durable, long-life option that requires little to no maintenance in this type of underground water storage scheme. The McCann supply and installation teams worked closely with Clugston’s site personnel to ensure a speedy and successful build."

Neil Webster Clugston Construction